Professional technical team is able to provide an accurate assessment of complex mountain project resources and construction costs, minimizing the investment risk caused by resource uncertainty.
Based on high-precision terrain simulation and three-dimensional simulation technology, the design work of roads, foundation, civil engineering of step-up substation can be completed quickly and accurately for mountain wind power projects.
Small platform hoisting technology can minimize the peak cutting and the engineering cost while achieving an accurate estimation of the power loss caused by peak cutting.
A variety of fan foundation forms suitable for different geological conditions are available, which can reduce the project cost, and shorten the construction period.